Electromagnetic Overhead Crane bridge overhead magnetic crane with magnet industry standard mainly relies on the magnet, using the electromagnetic principles
- 5-15M/MIN
- 20-40M/MIN
- 50-100M/MIN
- A5-A7
- cabin control/wire rope remote control
- IP54
- F
- request
- 3 phase 380V 50hz or request
Safety Device
1. Overload protection and main lifting motor with thermal protection.
2. Hooks with latch, rubber buffers and protective earthing.
3. Crane switch, travel end switch and emergency switch can stop all movement when any dangerous happened.
4. All crane must be assembled and tested before leaving factory and offer the certification of test.






