This grab bridge crane is widely used in freight port, river wharf, power plants, concrete mixing station, industrial and mining enterprises
- Lifting speed: 5-15M/MIN
- Trolley running speed: 20-40M/MIN
- Crane running speed: 50-100M/MIN
- Working duty: A5-A7
- Control method: cabin control/wire rope remote control
- Protection grade: IP54
- Insulation grade: F
- Colour: request
- Power supply: 3 phase 380V 50hz or request
Characteristic of QC electric double beam/ girder bridge/ overhead crane
- Lifting Capacity: 5-20T
- Span: 10.5m-31.5m (Non-standard design can be made)
- Working Class: A6~A8
- Working Temperature: -25°C to ~40 ° C
- Voltage: 380V 50Hz 3-phase
Features and Advantages of Grab Single/Double Beam Bridge Crane
1.Heavy Duty and High Efficient
2.Suitable for any environment ( High Temperature, Explosion Proof and so on)
3.Long Life Span: 30-50years.
4.Easy for Installation and maintenance.
5.Reliable structure









